Casualty estimation
Shows KIA, WIA, and DNBI flow by hour, priority, and phase. Includes low, expected, and high ranges.
CHIRON takes force laydown, tempo, routes, treatment capacity, and supply assumptions, then returns hourly casualty projections, Role 1-4 caseload, evacuation timings, bed demand, blood demand, and Class VIII demand.
The Casualty Projections view shows when casualties are expected to arrive, how they break down by priority, and when peak load occurs. Staff can compare low, expected, and high runs and check which planning assumptions are driving the range.
CHIRON supports planning. It does not diagnose, treat, or store patient records.
Preview onlyFigures shown on this page are illustrative placeholders for layout. CHIRON deployments operate on real planning inputs and produce real analysis.
CHIRON does not apply one casualty rate across the whole operation. It runs the plan against enemy doctrine, geography, force laydown, and tempo, then shows the casualty range produced across repeated runs.
The same scenario inputs drive each output. Change tempo, route, treatment capacity, or supply stock once, and CHIRON updates casualty flow, facility load, evacuation timings, and sustainment demand from that change.
Shows KIA, WIA, and DNBI flow by hour, priority, and phase. Includes low, expected, and high ranges.
Places treatment facilities, holding capacity, and beds against projected demand. Shows where demand exceeds capacity.
Tests evacuation routes against distance, terrain, threat, timings, and lift. Shows which routes miss required timelines.
Forecasts Class VIII, blood, beds, and rotation demand by location and phase.
Change force laydown, tempo, route, treatment capacity, or supply stock. CHIRON updates casualty flow, capacity shortfalls, evacuation timings, and sustainment demand from that change.
Project casualties by phase and priority.
Put treatment and bed capacity against projected demand.
Calculate evacuation routes and timings between roles.
Project supply, blood, and bed demand.
Change an input and recalculate the outputs.
CHIRON can be installed inside an on-premise or air-gapped environment. The plan does not need an outside service to run.
Installed inside your environment. No cloud service is required.
On-premise · offlineUses NATO medical planning logic and staff outputs your teams recognise.
AJP-4.10Force data, routes, assumptions, and outputs stay on infrastructure you control.
Full data sovereigntyInputs and revisions are logged so the plan can be reviewed later.
Full audit trailCHIRON is in operational preview. New builds are tested against planning cases before release. Updates focus on model behavior, doctrine changes, interface clarity, and staff briefing outputs.
The current build is v0.9.4. Development continues, but the preview is already shaped around real planning cases and the briefing products staff need.
Send the echelon, scenario type, planning assumptions, and outputs you need to see. We will show CHIRON against a comparable case.